Home Renovation
After nearly twenty years in the same house, Rahul and Priya meet a contractor to plan a renovation of the kitchen and bathrooms before their daughter's wedding.
Key words and phrases
Useful sentences
- Ask What's included in this estimate you've given us?
- Answer It covers tiling work, plumbing, and the modular kitchen installation.
- Ask Will the electrical rewiring add much to the cost?
- Answer A little, but it's necessary given how old the current wiring is.
- Ask How can we avoid a budget overrun?
- Answer By finalizing material selection early and avoiding last-minute changes.
- Ask Should we plan for a layout change in the kitchen?
- Answer It's possible, but it will add both time and cost.
- Ask How do we manage cooking while the kitchen is under work?
- Answer We'll set up a temporary arrangement in the store room.
- Ask Does the tiling come with any warranty?
- Answer Yes, there's a two-year warranty period on the fittings.
- Ask Is the construction dust going to be a big problem?
- Answer We'll cover the furniture and seal off the work area to reduce it.
- Ask When will the finishing touches be done?
- Answer In the last week, right before your daughter's wedding.
Dialogue
RahulWe'd like to renovate the kitchen and both bathrooms before the wedding.
ContractorThat's doable. Let me give you a rough estimate first, based on a modular kitchen and new tiling work.
PriyaWill you also need to touch the plumbing?
ContractorYes, some old plumbing needs replacing, and I'd recommend electrical rewiring too.
RahulWe're a little worried about a budget overrun with all these changes.
ContractorWe'll finalize material selection early and give you fixed quotes to avoid that.
PriyaHow will we manage without a kitchen for a few weeks?
ContractorWe can help you set up a temporary arrangement in another room.
RahulAnd you're confident this can all be done before the wedding date?
ContractorYes, we'll plan the finishing touches for the last week before the event.
Common mistakes
- Saying "do renovation" instead of "do a renovation" or "get the house renovated."
- Saying "give estimate" instead of "give an estimate" or "give us an estimate."
- Saying "budget is overrun" instead of "there's a budget overrun" or "we went over budget."
- Saying "change layout" without an article, better as "make a layout change."
- Saying "plumbing is old" as a standalone fragment, better as "the plumbing is old."
- Saying "finishing touch" instead of "finishing touches" (usually plural).
Quick quiz
1. What is a "modular kitchen"?
2. What does "budget overrun" mean?
3. What is "electrical rewiring"?
4. What is a "warranty period"?
5. What does "layout change" mean?
6. What are "finishing touches"?
Practise speaking and listening
The free Day to Day English app turns every lesson into practice with audio, a story you follow and more than 1680 words to learn.